OH Consultant
← All SWMS Documents
πŸ€

Termite Inspection SWMS

Visual termite / timber pest inspection of residential or commercial property. Includes subfloor crawl, roof void entry, perimeter inspection, moisture-meter use, thermal-camera scanning, photographic record.

βš–οΈWHS Regulation 2025 & Codes of Practice β€” legally binding from 1 July 2026 (s26A)
πŸ‘·Reviewed by certified occupational health and safety professionals
πŸ—ΊοΈState-specific variants for all 8 Australian jurisdictions
$99 AUDβœ“ Instant Download Available

SWMS variants reference your state’s WHS legislation. Instant download after payment.

Termite and timber pest inspections require technicians to access confined subfloor cavities, traverse fragile roof voids, and assess perimeters of residential and commercial buildings using moisture meters, thermal imaging cameras, and torches. The work routinely exposes inspectors to biological agents, asbestos-containing materials in pre-1990 building fabric, manual handling strain from crawling postures, and the risk of falls through ceilings or onto unstable substrates. Under WHS Regulation 2025, entry to confined or restricted-access spaces and work involving biological hazards triggers Schedule 1 High Risk Construction Work categories, making a documented Safe Work Method Statement mandatory before any inspection commences. A PCBU who deploys a technician without a task-specific SWMS, signed by each worker and available on site, contravenes regulation 299 and exposes the business to enforceable undertakings, prohibition notices, and prosecution. This SWMS covers the full inspection workflow β€” pre-entry assessment, subfloor and roof void access, instrument use, perimeter survey, and photographic documentation β€” aligned to AS 4349.3 and AS 3660.2.

Hazards identified

7 hazards covered, sorted by priority.

Asbestos-containing material (ACM) disturbance in subfloor lagging, vermiculite ceiling insulation, or millboard sheeting in pre-1990 buildingsHIGH

Inhalation of airborne fibres causing mesothelioma, asbestosis, or lung cancer with latency of 20-40 years post-exposure

Fall through unbattened ceiling, brittle roofing sheets, or rotted subfloor bearers during void traversalHIGH

Fractures, spinal injury, head trauma or fatality from fall onto hard surface below the access plane

Biological exposure to rodent droppings, bat guano, possum urine, and arachnid bites in confined cavitiesHIGH

Leptospirosis, histoplasmosis, lymphocytic choriomeningitis, redback or whitetail envenomation requiring hospitalisation

Heat stress and oxygen depletion in unventilated roof voids reaching internal temperatures above 55Β°CHIGH

Heat exhaustion, heat stroke, syncope and collapse with delayed rescue from confined elevated space

Manual handling injury from prolonged crawling, kneeling and reaching postures in subfloor spaces under 600mm clearanceMEDIUM

Lumbar disc injury, shoulder impingement, knee bursitis and chronic musculoskeletal disorders requiring workers compensation

Electrical contact with damaged subfloor wiring, exposed conductors, or unmarked active circuits during cavity traversalHIGH

Electric shock, cardiac arrhythmia, burns or electrocution from contact with energised conductors in damp environments

Live termite activity (Coptotermes, Mastotermes) and associated soldier mandible bites or formic acid spray during nest disturbanceLOW

Localised dermatitis, allergic reaction, and contamination of inspection equipment with biological residue

Control measures

Hierarchy-of-controls order: elimination β†’ substitution β†’ isolation β†’ engineering β†’ administrative β†’ PPE.

  1. 1Elimination β€” Decline inspection access where asbestos register flags friable ACM or where roof void substrate fails visual integrity assessment from the manhole.
  2. 2Elimination β€” Conduct perimeter and external inspection only where structural condition of subfloor bearers or ceiling battens cannot be verified as safe.
  3. 3Substitution β€” Use borescope cameras and remote thermal imaging through service penetrations in lieu of full body entry where building geometry permits.
  4. 4Engineering β€” Deploy crawl boards spanning ceiling joists and rated 120kg minimum across roof voids to distribute load away from plasterboard or brittle sheeting.
  5. 5Engineering β€” Use forced-air ventilation fans at subfloor and roof access points to reduce internal temperature and replenish oxygen prior to entry.
  6. 6Administrative β€” Complete pre-entry checklist covering asbestos register review, electrical isolation confirmation, atmospheric assessment, and two-person communication protocol before access.
  7. 7Administrative β€” Limit continuous subfloor or roof void exposure to 30 minutes with mandatory rest, hydration and visual check-in at 10-minute intervals per AS 2865.
  8. 8Administrative β€” Brief and sign-on every worker against this SWMS at the pre-start, with photographic record of access points and identified hazards retained for seven years.
  9. 9PPE β€” Wear P2 respirator, disposable Type 5/6 coveralls, nitrile gloves, knee pads, hard hat with chin strap, and impact-rated safety glasses for all void entries.
  10. 10PPE β€” Use intrinsically safe LED headlamp, high-visibility long sleeves, steel midsole boots, and personal gas monitor where confined space classification applies.

Applicable Codes of Practice

AS 4349.3-2010 Inspection of Buildings Part 3: Timber Pest Inspections

Defines minimum inspector competency, access requirements, reportable conditions and safety obligations when inspection access is restricted or unsafe.

AS 3660.2-2017 Termite Management β€” In and Around Existing Buildings and Structures

Sets methodology for visual inspection, moisture assessment and reporting that drives the technician's exposure profile and SWMS scope.

How to Manage Work Health and Safety Risks Code of Practice (Safe Work Australia, 2025)βš– Legally binding Β· 1 Jul 2026

Mandates hierarchy of control application and consultation under WHS Act sections 19 and 47-49 for all pest inspection PCBUs.

How to Safely Remove Asbestos Code of Practice and AS 2865-2009 Confined Spacesβš– Legally binding Β· 1 Jul 2026

Triggered when inspection enters pre-1990 building fabric or any space meeting confined space criteria under WHS Regulation 2025 Part 4.3.

High-Risk Construction Work triggered

15
Work in or near a confined space

Subfloor cavities under 600mm clearance and unventilated roof voids meet the WHS Regulation 2025 confined space definition for atmospheric and access risk.

10
Work involving the disturbance of asbestos

Inspection of pre-1990 subfloor lagging, eaves sheeting and vermiculite insulation creates foreseeable disturbance of asbestos-containing materials during traversal.

14
Work carried out in an area with movement of powered mobile plant or biological hazards

Exposure to rodent droppings, bat guano, arachnids and live termite colonies in enclosed cavities constitutes biological agent exposure under Schedule 1.

Legal consequence

PCBU must prepare, consult workers on, and retain this SWMS for two years post-incident; failure attracts Category 1-3 offences with penalties indexed annually under the prevailing WHS schedule.

Who this is for

  • β†’Licensed timber pest inspectors and pre-purchase consultants
  • β†’Pest control PCBUs servicing residential and strata portfolios
  • β†’Building surveyors conducting combined structural and pest reports
  • β†’Property managers commissioning periodic termite inspections

What you receive

  • βœ“Editable DOCX template β€” Microsoft Word compatible
  • βœ“State-specific WHS legislation schedule (NSW/VIC/QLD/SA/WA/TAS/NT/ACT)
  • βœ“Hazard register with risk ratings + hierarchy-of-control mapping
  • βœ“Worker sign-on register, pre-start checklist, and incident escalation flow

Worked example

On a Tuesday pre-start at a 1960s weatherboard cottage scheduled for a pre-purchase timber pest inspection, the lead inspector opens this SWMS on a tablet at the vehicle tailgate with the second-year apprentice. They walk through the hazard register together: the asbestos register supplied by the vendor flags millboard behind the meter box, so the inspector marks that zone external-only and adds a note to the photographic record. The subfloor clearance is measured at 480mm with a tape through the access vent, triggering the confined space controls β€” they set up a forced-air fan, agree 10-minute radio check-ins, and the apprentice remains at the access hatch as standby. Both workers sign the SWMS sign-on register against their names and licence numbers. Mid-inspection, the apprentice reports the thermal camera showing a 38Β°C anomaly near the bathroom wet area; the inspector pauses, refers to the SWMS biological hazard control, dons fresh nitrile gloves before probing the affected timber, and photographs the active Coptotermes workings without disturbing the gallery. On exit, coveralls are bagged for disposal, the moisture meter and torch are wiped down with biocide, and the SWMS is annotated with the in-field control adjustment before being filed against the job number for the seven-year retention period.

Related legislation

  • WHS Act 2011 (model)
  • WHS Regulation 2025
  • Managing Risks of Hazardous Chemicals CoP; APVMA registered product label requirements
What's in this SWMS

Document details

Regulation
WHS Regulation 2025, Schedule 1 β€” High Risk Construction Work
HRCW Category
Working in subfloor / roof void, manual handling, biological agents
Hazards Identified
7 hazards with controls
Format
Editable DOCX (Microsoft Word)
Author
Certified Industrial Hygienist (CIH)
Delivery
Instant download after payment