Earthworks & Demolition SWMS Templates
Ground disturbance, site clearance, and heavy earthmoving.
About these SWMS
Earthworks and demolition cover ground disturbance, bulk excavation, trenching, site clearance, structural and non-structural demolition, and operation of powered mobile plant on Australian construction sites. These works carry some of the highest fatality and serious injury rates in construction, triggering specific duties under WHS Regulation 2025 Part 6.3 (Demolition Work), Part 6.4 (Excavation Work), and Chapter 6 High Risk Construction Work (HRCW). Compliance is anchored to AS 2601-2001 The Demolition of Structures, the Excavation Work Code of Practice, the Demolition Work Code of Practice, and the Construction Work Code of Practice. SWMS in this category address excavation deeper than 1.5 metres, demolition of load-bearing elements, mobile plant operation, and adjacent service strikes — the four highest-litigated risk areas in civil and demolition contracting.
What this category covers
- ✓Bulk and detail excavation including trenches deeper than 1.5 metres
- ✓Mechanical demolition using excavators with shears, hammers and grapples
- ✓Structural demolition of load-bearing walls, slabs and columns
- ✓Soft-strip and non-structural interior demolition prior to refit
- ✓Facade removal and partial demolition adjacent to occupied structures
- ✓Chimney, silo and tall-structure progressive demolition
- ✓Pre-demolition asbestos and hazardous material removal
- ✓Civil road construction, kerb and channel, and pavement breaking
- ✓Dial-Before-You-Dig service location and underground utility protection
- ✓Earthmoving with dozers, scrapers, graders and articulated dump trucks
- ✓Spoil management, stockpiling and contaminated soil handling
- ✓Site establishment, clearing, grubbing and temporary access roads
76 SWMS in this category
76 ready-to-buy editable DOCXs · 8 state variants per product · available for instant download.
Demolition
49 SWMS💥Demolition SWMS
Structural demolition including soft-strip, hard demolition, and façade retention work on commercial structures.
💥Asbestos Removal — Pre-Demolition SWMS
Pre-demolition asbestos removal involves identifying and removing all asbestos-containing materials from a structure before demolition comme…
🔨Bridge Demolition SWMS
Demolition of road or rail bridges, overpasses. Engineered sequenced demolition, traffic / rail closures, crane support of structural member…
🔥Bushfire Rebuild & Cleanup SWMS
Post-bushfire property cleanup and rebuild preparation — asbestos identification on damaged sheet / pipe lagging, structural collapse risk a…
💥Chimney Demolition SWMS
Chimney demolition involves the removal of masonry, brick or concrete chimneys from residential and industrial buildings. Chimneys are inher…
💥Concrete Breaking — Hydraulic and Pneumatic SWMS
Concrete breaking involves using hydraulic breakers, pneumatic jackhammers, and electric demolition hammers to break up concrete slabs, foot…
🚜Concrete Pile Removal SWMS
Concrete pile removal and cropping covers hydraulic pile cropper operation, splitter ram use for pile head reduction, exposed reinforcement …
💥Explosive (Implosion) Demolition SWMS
Explosive (implosion) demolition SWMS for NSW. Danger-zone establishment, flyrock, misfire, security and notification, vibration and airblas…
💥Facade Removal SWMS
Facade removal involves dismantling external cladding, curtain wall, glazing and external wall systems. The work is at height, involves heav…
🔨Hard Strip Demolition SWMS
Hard strip demolition removing structural elements — concrete walls, slabs, brickwork, steel framing. Uses jackhammers, concrete saws, oxy c…
🔨Hazmat Demolition SWMS
Demolition of buildings with multi-hazmat contamination — lead paint, PCB ballasts, asbestos, contaminated soil. Includes hazmat survey, seq…
🔨Internal Strip-Out SWMS
Internal strip-out / soft strip demolition of commercial or residential interiors — removal of partition walls, ceilings, joinery, fittings,…
🔨Manual Hand Demolition SWMS
Manual demolition using crowbars, sledgehammers, hand-held power tools — used for heritage works, surgical demolition, areas inaccessible to…
💥Mechanical Demolition — Excavator with Attachments SWMS
Mechanical demolition uses excavators fitted with hydraulic breakers, crushers, shears and grapples to demolish structures. The excavator pr…
🔨Mechanical Demolition SWMS
Mechanical demolition of buildings using excavator with hydraulic shears, hammers, processors. Sequenced top-down or hi-reach demolition, du…
💥Non-Structural Demolition — Strip-Out SWMS
Non-structural demolition (strip-out) involves removing non-load-bearing walls, ceilings, flooring, fixtures and fittings. While less catast…
🔨Oil/Fuel Tank Demolition SWMS
Demolition of above-ground / below-ground oil and fuel storage tanks. Includes residue purging, sludge removal, vapour testing before cuttin…
🔨Pool Demolition SWMS
Demolition / removal of in-ground swimming pool — concrete or fibreglass. Drain-down, service disconnection, mechanical breakup with excavat…
🚧Site Set-Up — Demolition SWMS
Pre-demolition site establishment covers perimeter hoarding install, public exclusion zones, services disconnection (gas, water, electrical)…
🔨Smelter / Furnace Demolition SWMS
Demolition of industrial smelters and furnaces. Includes pre-demo refractory characterisation, residue testing (heavy metals), controlled co…
🔨Soft Demolition / Strip-Out SWMS
Soft demolition (strip-out) covers internal non-structural demolition, asbestos identification before commencement, dust suppression, manual…
💥Soft Strip Interior Demolition SWMS
Soft strip demolition involves removing all internal fit-out elements — suspended ceilings, partitions, raised floors, services, fixtures an…
💥Structural Demolition — Load-Bearing Elements SWMS
Structural demolition involves the removal of load-bearing walls, columns, beams, floors and roof structures. This is specifically listed as…
🔨Tank & Silo Demolition SWMS
Demolition of industrial tanks (steel, concrete) and silos. Includes residue purging and cleaning, confined space entry for internal cutting…
🚢Demolition — Vessel SWMS
Vessel and ship breaking demolition covers slipway and dry-dock dismantling, asbestos and PCB identification and removal, hot work in confin…
Civil Works Roads
37 SWMS🛣️Civil/Roads SWMS
Road construction, kerb and channel, drainage, and traffic management on civil infrastructure projects.
🚜Asphalt Paver SWMS
Asphalt paver (spreader) operation covers hopper loading from haul trucks, screed temperature management, hot-mix exposure controls (180°C+ …
🏗️Asphalt Paving SWMS
Safe Work Method Statement covering the key hazards and control measures for asphalt paving.
🚜Bollard / Speed Bump / Tactile SWMS
Bollard, speed bump, and tactile paving installation covers core drilling for bollard fixing, traffic-calming installation, DDA-compliant ta…
🚦Bollard & Barrier Installation SWMS
Safe Work Method Statement covering the key hazards and control measures for bollard & barrier installation.
🔧Bridge Construction (General) SWMS
SWMS template for bridge construction (general). Covers Combines crane + steel + concrete + heights.. 8-state AU coverage, CIH-reviewed edit…
🔧Bridge Maintenance & Painting SWMS
SWMS template for bridge maintenance & painting. Covers Maintenance painting, lead removal.. 8-state AU coverage, CIH-reviewed editable DOCX…
🚜Bulk Excavations SWMS
Bulk excavation operations covers large-scale cut-and-fill earthworks for civil and commercial sites, dozer-grader-haul truck integration, B…
🚜Civil Road Base & Seal SWMS
Road base preparation and bituminous seal application covers DGB-20 sub-base laying, prime coat application, sprayer and roller integration,…
🚜Civil Shoulder Grading SWMS
Road shoulder grading covers grader operation along live traffic corridors, traffic management plan integration, drainage profile maintenanc…
🛣️Footpath / Concrete Slab Construction SWMS
SWMS template for footpath / concrete slab construction. Covers Pedestrian path construction, pram ramp, tactiles.. 8-state AU coverage, CIH…
🛣️Kerb & Channel Construction SWMS
SWMS template for kerb & channel construction. Covers Formwork, pour, trowel finish. 8-state AU coverage, CIH-reviewed editable DOCX, availa…
🚧Line Marking SWMS
Safe Work Method Statement covering the key hazards and control measures for line marking.
🔧MSE / Mechanically Stabilised Earth Wall SWMS
SWMS template for mse / mechanically stabilised earth wall. Covers Reinforced earth construction, civil retaining.. 8-state AU coverage, CIH…
🛣️Pavement Profiling / Milling SWMS
SWMS template for pavement profiling / milling. Covers Cold planer milling, conveyor, truck loading.. 8-state AU coverage, CIH-reviewed edit…
🛣️Road Base Preparation & Compaction SWMS
SWMS template for road base preparation & compaction. Covers Subgrade trim, pavement materials, density compliance.. 8-state AU coverage, CI…
🚜Road Profiler Machine SWMS
Road profiler (cold planer) operation covers asphalt milling for resurfacing, conveyor loading to haul trucks, water spray dust suppression …
🚜Road Safety Barrier Install SWMS
Road safety barrier installation covers W-beam guardrail, wire-rope barrier, and concrete barrier installation per Austroads and AS/NZS 3845…
🚜Stabilising Road Pavement SWMS
In-situ pavement stabilisation covers cement and lime stabiliser spreader operation, dust suppression for hazardous chemical exposure, deep-…
Earthmoving
27 SWMS🚧Earthmoving SWMS
Bulk earthworks, cut and fill, site levelling, and material movement using dozers, scrapers, and loaders.
🚜Articulated Dump Truck (ADT) Operations SWMS
SWMS template for articulated dump truck (adt) operations. Covers Bulk haulage on civil/mine. Tipping, reversing.. 8-state AU coverage, CIH-…
🚜Backhoe Loader Operations SWMS
SWMS template for backhoe loader operations. Covers Combination digging + loading, reach radius, spotter.. 8-state AU coverage, CIH-reviewed…
⚙️Concrete Agitator Truck (Driver/Operator) SWMS
SWMS template for concrete agitator truck (driver/operator). Covers Site delivery, slump test, chute discharge. 8-state AU coverage, CIH-rev…
⚙️Concrete Pump Truck (Boom Pump) Operation SWMS
SWMS template for concrete pump truck (boom pump) operation. Covers Set-up, outriggers, boom deployment. 8-state AU coverage, CIH-reviewed e…
🚜Road Roller Operations (Smooth & Padfoot) SWMS
SWMS template for road roller operations (smooth & padfoot). Covers Compaction, pass count, edge work. 8-state AU coverage, CIH-reviewed edi…
🚜Road Sweeper SWMS
Operation of road sweeper truck for construction site or municipal sweeping. Includes water-spray dust suppression, traffic management, hopp…
🚜Scraper Operations SWMS
SWMS template for scraper operations. Covers Bulk earthworks, cut-and-fill, push-pull.. 8-state AU coverage, CIH-reviewed editable DOCX, ava…
🚜Track Loader SWMS
Operation of track-mounted loader for soft / boggy ground or slope work. Includes ground stability check, traction control, slope angle limi…
🚜Truck-Mounted Crane SWMS
Operation of truck-mounted articulating crane (Hiab / Palfinger) for material delivery and lifting. HRWL CN or C0 licensing, outrigger deplo…
⚙️Vacuum Truck (General — Non-NDD) SWMS
SWMS template for vacuum truck (general — non-ndd). Covers Drains, pits, spills. 8-state AU coverage, CIH-reviewed editable DOCX, available …
🚜Vibrating Roller SWMS
Operation of vibrating drum roller for compaction of asphalt or sub-base material. Includes pre-start check, vibration frequency control to …
⚙️Water Tanker (Civil Dust Suppression) SWMS
SWMS template for water tanker (civil dust suppression). Covers Civil-grade water cart, dust suppression.. 8-state AU coverage, CIH-reviewed…
🚜Wheel Loader / Front-End Loader Operations SWMS
SWMS template for wheel loader / front-end loader operations. Covers Bulk handling, stockpile management, bucket attachments.. 8-state AU co…
Civil Utilities
15 SWMS🚜Civil Drilling & Piling SWMS
Civil drilling and piling covers CFA pile installation, bored pier construction, screw pile install, drilling rig setup, spoil management, a…
🔧Pneumatic Boring SWMS
Pneumatic boring, impact moling, and pipe jacking under roads and footpaths — bore pit excavation, pneumatic equipment setup, service cleara…
🌧️Stormwater Drainage SWMS
Stormwater drainage installation — pipe laying in trench, pit and headwall construction, concrete encasement, surface restoration, and diver…
🚜Trailer Hydro Excavator SWMS
Trailer-mounted hydro excavator operations covers non-destructive vacuum excavation for utility location, BYDA compliance, high-pressure wat…
🪛Trench Shoring SWMS
Trench shoring and excavation support — hydraulic shoring box installation, drag box use, soldier piles and lagging, engineered shoring syst…
🕳️Vacuum Excavation NDD SWMS
Vacuum excavation (hydrovac and air-vac) for non-destructive digging near underground services — potholing, service exposure, and pit backfi…
💦Water Cart SWMS
Water cart and dust suppression truck operations on construction and civil sites — pre-start checks, safe filling at standpipe, road dust su…
💧Water Treatment Plant Maintenance SWMS
Routine and corrective maintenance of potable / wastewater treatment assets — clarifier / digester / wet-well confined-space entry, chemical…
Civil Stormwater Drainage
7 SWMS🚜Civil Drain Clearing SWMS
Civil stormwater drain clearing covers vacuum truck operations, confined-space pit entry, root cutter and hydro-jetter use, and AS 3500/AS 2…
🛠️Gas Main Installation (PE / Steel) SWMS
SWMS template for gas main installation (pe / steel). Covers PE pipe electrofusion, steel pipe welding, commissioning.. 8-state AU coverage,…
🧱Geofabric Installation SWMS
Geofabric and erosion control fabric installation covers sediment fence, silt curtain, and geotextile install for civil and landscaping proj…
🛠️Water Main Installation (DICL / PE / PVC) SWMS
SWMS template for water main installation (dicl / pe / pvc). Covers Trench, bedding, jointing. 8-state AU coverage, CIH-reviewed editable DO…
Traffic Management
5 SWMS🚦Traffic Controller SWMS
Traffic controller duties on construction sites and roadworks — stop/slow bat operations, site entry control, worker and public traffic mana…
🚦TMP Implementation SWMS
Implementation of traffic management plans on public roads — setting up exclusion zones, delineation, speed reductions, and worker protectio…
🚦Traffic Management SWMS
Construction site traffic management plan implementation. Covers traffic controller responsibilities (stop/slow baton, TAA accreditation), t…
Excavator Operations
3 SWMS🚧Excavator Ops SWMS
Tracked and wheeled excavator operations including digging, lifting, demolition attachments, and trenching.
🚜Mini Excavator SWMS
Mini excavator, Kanga, and Dingo (compact tracked loader) operations — pre-start, trenching, service avoidance, site access on slopes, and s…
Night Works Site
1 SWMS🌙Night Works SWMS
Night works and after-hours construction — lighting plan, minimum lux levels, fatigue management, noise compliance curfew, communication pro…
Applicable standards & regulations
Frequently asked questions
Is excavation work always classified as high risk construction work in Australia?
Not always. Under WHS Regulation 2025 Schedule 3, excavation becomes HRCW when the trench or shaft is deeper than 1.5 metres (Category 6), when work is in or near a shaft or tunnel, or when powered mobile plant is used (Category 13). Shallow hand excavation outside these triggers is not HRCW, but a SWMS is still strongly recommended and the Excavation Work Code of Practice applies. Most commercial earthworks will hit at least one HRCW trigger.
Do I need to notify the regulator before starting demolition work?
Yes, for certain demolition. WHS Regulation 2025 requires written notification to the WHS regulator at least 5 days before demolition of any structure or part that is load-bearing or otherwise related to the physical integrity of the structure, and for structures at least 6 metres in height. The Demolition Work Code of Practice details the notification content. Notification thresholds vary slightly between jurisdictions, so confirm with your state regulator before lodging.
What is the difference between a SWMS and a demolition plan?
A SWMS addresses the HRCW activity-level hazards, controls and PPE for workers performing specific tasks. A demolition plan, required under AS 2601-2001 and the Demolition Work Code of Practice, is a project-wide document covering structural surveys, sequencing, hoarding, public protection and waste streams. Both are mandatory for load-bearing demolition — the SWMS sits underneath the demolition plan and translates it into worker-level controls signed off by the crew.
Are these earthworks and demolition SWMS valid in all Australian states and territories?
Yes. These SWMS are written against the harmonised model WHS Regulation 2025 adopted by NSW, Queensland, ACT, NT, Tasmania, South Australia and Western Australia, and reference the Safe Work Australia model Codes of Practice. Victoria operates under OHS Regulations 2017 but the HRCW concept and SWMS content map directly across. Each template includes a jurisdiction sign-off block and references the applicable state regulator notification thresholds for demolition and excavation.
Do I need a separate SWMS for each piece of mobile plant on site?
Best practice is one SWMS per plant type and task combination — for example, a dedicated SWMS for excavator trenching, another for excavator demolition with a hammer attachment, and another for dozer push. WHS Regulation 2025 Schedule 3 Category 13 makes powered mobile plant HRCW, requiring task-specific controls for visibility, spotters, exclusion zones and ground conditions. Generic 'all plant' SWMS rarely satisfy regulator inspection because they cannot address the unique kinematics of each machine.
Earthworks & Demolition SWMS